Six preparatory work before using the High Pressure Mill


"Worker, who wishes to do his work must first sharpen his apparatus",so does High Pressure Mill, if you want to process high-quality materials, before milling equipment put into production ,you need to do a comprehensive inspection and maintenance work, the following six work must do seriously.
  
1 , Production and processing plant and milling industry workshop plans must be in accordance with the process of the mill production line design and planning, and the dimensions must be taken into account, if not,the high-pressure mill equipment don’t enter production workshop finally.
   
2, High pressure mill processing plant with water and electricity, electricity for a single-phase electricity, water, it is best to have a storage tank.
   
3, Plant flat cement pouring after 7-15 days of curing, make sure the ground was more solid.
   
4, the best line with a 2-3 ton crane or gantry crane, it is convenient for installation and maintenance of high pressure mill equipment.
   
5, high pressure mill running scene yet installed keeping safe, the exposed surfaces are coated with anti-rust grease, and avoid the sun and rain, to prevent the body rust influent to the establishment and maintenance system.
   
6, High Pressure Mill from the factory to the use of more than 6 months,the high pressure mill the host central axis system, transmission, roller device response to the various components in the analysis of oil pools should be cleaned, after the inspection cleaning checked Add enough oil.